P1 Group completed the mechanical construction for the University of Kansas Hospital Indian Creek Campus Expansion.

The overall footprint of the project was relatively small for the amount of utilities (pipe, duct, etc.) that had to be installed above the ceiling. This was a challenging task, but the detailers in P1 Group’s Virtual Design ÌìÃÀÖ±²¥ department and the various trades onsite successfully ensured all systems fit.

The expansion tripled the size of the previous facility, and included: Two new split barrel chillers; two new high pressure steam boilers; three new AHU’s and one new RTU; New medical vacuum pump and new medical air compressor; 34 private patient rooms; 24 clinic exam rooms; 8 operating rooms; a 24-bed prep/recovery area; expanded imaging, breast imaging, and interventional radiology.

Services Provided

  • VDC/BIM

  • HVAC, Plumbing, and Sheet Metal ÌìÃÀÖ±²¥

  • Fabrication (piping, plumbing, and sheet metal)

  • Test and Balance

Project Details

Location

Overland Park, KS

Completion

June, 2018

GC

JE Dunn ÌìÃÀÖ±²¥ Co.

Architect

Pulse Design

Engineer

Brack & Associates

construction services icon
Work with Our ÌìÃÀÖ±²¥ and Fabrication Experts

Need a team of professional specialty contractors to help with your next construction project? Get started by finding a P1 ÌìÃÀÖ±²¥ location near you.

project portfolio icon
View More ÌìÃÀÖ±²¥ Projects

Still not sure if P1 ÌìÃÀÖ±²¥, LLC is the right fit? Feel free to check out more examples of our past work and hear from our statisfied customers.